Climbing frame

Plan:

Supplies are:

I think 3 bags of gravel for the bottoms of the holes was a bit optimistic! I can't be bothered doing any more digging than absolutely necessary, so there is not going to be a lot of gravel at the bottom. Oh well.

I've stopped for lunch now, plan to do some more digging after.

Holes finished and lined with gravel:

I didn't even use half a bag of gravel, lol.

Side pieces assembled:

These are just about light enough to lift up and carry. The plan is to lift one of these into place and attach the horizontal braces to it, then lift the other one into place and attach the horizontal braces to that, and then it should stand up on its own.

Then we shift it around until it looks square and level, and then pour concrete into the holes.

It is going to rain very soon so we've stopped for now, hopefully only 90 mins of rain though, probably we can resume about 4pm.

Other random parts:

Hopefully the arrangement of these parts becomes clear on its own once the main structure is up.

Well it went OK!!

Except Ben from next door came and asked if we have planning permission, lol, I hope he's not serious else we may have to cut it down to 2.5m or whatever.

< 2025-08-27