Last modified: 2024-06-11 14:19:48
< 2024-06-10 2024-06-17 >I've got all 3 motor brackets fitted now, and I was able to carry the machine over to the tub without too much trouble.
Attached all 3 motors, fired up LinuxCNC, worked straight away, great success.
https://www.youtube.com/watch?v=p32K73Wn9qA
Still need to:
Pieces glued together with 10mm dowel, and 2 coats of "yacht varnish" sprayed on.
I'll probably do at least 1 more coat of varnish.
< 2024-06-10 2024-06-17 >